Projects

A Half-Court for a Small Town School
The principal's office at this school in Shimla holds its history quietly. Framed photographs of every graduating class since the school opened, arranged in four rows along one wall. A shelf of state-level academic competition trophies. A window looking out onto the rear compound — the same compound where, for as long as anyone on staff could remember, children had played improvised games with a deflated ball and a bent iron ring bolted to a stone wall. The ring was not at regulation height. Nobody had ever measured it. There... Read more...
The IT Park That Became a Sports Hub
On Day 1, before a single tile had arrived, we mounted a timelapse camera to a structural column at the north end of the space. Frame interval: fifteen minutes. Over the next 28 days, it recorded 7,800 square feet of empty ground-floor retail becoming a six-court badminton complex — tile by tile, court by court, from a bare concrete slab with exposed HVAC overhead to a fully lit, acoustically tuned, league-ready sports facility. Compressed to three minutes, it is one of the most satisfying construction sequences we have produced. The... Read more...
Volleyball Courts for a Beach Town Academy
Two weeks after handover. The Blue and Golden Yellow court catches the afternoon light in a way the sand never did — visible from the approach road, a kilometre away. Eleven years. That is how long the head coach had trained competitive volleyball players on beach sand, with no hard court to his name. He was very good at it — sand builds exceptional leg power, aerial sense, and ball control that no gym programme can replicate. But sand and hard court are different games. His players would arrive at... Read more...
A Farmhouse Multi-Sport Paradise
The Doon Valley is made for this kind of afternoon. Sal forests on the ridgeline, the valley floor opening wide below, and tucked inside a private estate with mature trees on all sides — a Blue basketball court catching the late sun. A Green badminton court sits forty feet to the east. Both courts have a spectator pavilion and a garden that was already there when we arrived. The two large sal trees at the eastern boundary? Still standing. We built around them. That turned out to be the best... Read more...
EPDM Play Area for a Preschool Campus
Fire Red Sunshine Yellow Sky Blue Leaf Green Four EPDM rubber zones, each a different primary colour — chosen after the school let a class of four-year-olds vote by pressing painted handprints on paper. Jaipur Rajasthan 2,400 Square Feet 10 Days to Complete 15mm Cushion Thickness 4 Color Zones 180+ Children, Ages 3–6 THE CHALLENGE The principal had seen too many scraped knees. The existing play area was compacted red earth with a few patches of concrete thrown in — barely functional, and completely wrong for children still learning how... Read more...
The Society That Replaced Their Swimming Pool
Before — 8 years, ₹3.5L/year in maintenance After — ₹12K/year, 50+ weekly players 3,200 sqft transformed — same footprint, entirely different story Bangalore, Karnataka Residential society — pool-to-courts transformation The vote was 47 to 11. The society committee had put a single motion before their general body: decommission the swimming pool and build sports courts in its place. The 11 who voted against were not opposed to sports courts. They were opposed to what felt, on paper, like giving up a community asset. It took nearly an hour of discussion... Read more...
A 10,000 sqft Corporate Wellness Zone
Pune, Maharashtra Corporate campus — technology sector, 2,000+ employees on-site The Head of People Operations opened the conversation not with a specification sheet but with a data point: "Our attrition numbers show that employees who engage with even one on-campus activity stay 30% longer than those who don't. We have the land. We need to give people a reason to use it." The land in question was 10,000 sqft at the rear of the campus — used, until that conversation, as overflow parking on event days and an informal shortcut... Read more...
The School That Said 'Cricket AND Basketball'
Phase 1 — Basketball (PP Tiles) Phase 2 — Cricket (Artificial Turf) Lucknow, Uttar Pradesh North India — Phased delivery across 35 days The sports committee meeting lasted two hours and forty minutes, by the principal's own account. On one side: the cricket coaching staff, who had been asking for a proper pitch surface for three years. On the other: the basketball programme, which had just produced two players shortlisted for inter-school district trials — and needed a regulation court before the tournament in six weeks. The principal made a... Read more...
A Rooftop Pickleball Court in the City
1,800 sqft of Green and Yellow PP tiles — 22 floors above South Mumbai's streets Mumbai, Maharashtra Penthouse terrace — 22nd floor, South Mumbai residential tower The brief arrived on a Tuesday morning with an unusual opening line: "The terrace is certified for 250 kg/sqm. We want a pickleball court." That number was not accidental. The client had already spoken to their structural engineer before calling us. They knew what the terrace could carry. What they needed to know was whether the right flooring system existed for those constraints —... Read more...
Tournament Grade in Chennai Heat
Project At A Glance — Chennai Sports Academy 12,000 Square Feet 30 Days to Complete ₹18.5L Total Investment 3 Competition Courts 8-Layer Acrylic System 38°C Peak Surface Challenge Chennai, Tamil Nadu South India — Coastal climate, peak summer surface temperatures 38°C+ When the facility manager of a sports academy in Chennai first called us, she led with a number: 38 degrees Celsius. Not the air temperature — the surface temperature of their existing courts at noon in May. They had a competitor's acrylic surface laid three years ago. It was... Read more...
PP Tiles at 5,000 Feet
The completed courts at 5,000 ft elevation — Blue and Light Green PP tiles with the eastern Himalayas behind them Dirang, Arunachal Pradesh Eastern Himalayas — 5,000 ft above sea level Some projects test your logistics. Others test whether your product actually works at the edge of what it was designed for. When a school in the Kameng valley of Arunachal Pradesh called us for a multi-sport court, our first question had nothing to do with colours or dimensions. It was simple: what does it get to in January? The... Read more...
Night Basketball Under the Stars
Noida, Uttar Pradesh 8:30 PM. 34 residents on court.Every evening. Night photography shown is representational. Actual site imagery will be updated upon client approval. Noida Uttar Pradesh 7,200 Square Feet — FIBA Court 10 Days to First Night Game 40% Saved on Base Cost 4×200W LED Floodlight Arrays 34 Residents Playing Daily 3 Yrs Surface Warranty THE CHALLENGE The existing concrete base had been poured by a previous contractor and then abandoned — the project had run out of money, or out of coordination, the RWA was not entirely sure... Read more...
A Cricket Pitch Between the Buildings
60 ft wide. 70 ft long. Buildings on both sides. No vehicle access from any angle. Most vendors said it was impossible. We said it was a pitch. Aerial view is representative. Drone photography of the actual completed installation pending client approval. Mysore Karnataka 4,200 Square Feet Total 12 Days, All Manual Delivery PP + Turf Dual Surface System 8 Corporate League Teams 2 Practice Nets (Both Ends) Diwali Corporate Trophy Tournament THE CHALLENGE The recreation committee had spent three months trying to find space on the campus for a... Read more...
Two Sports, One Monsoon Deadline
Race Against the Calendar 18 Days. Two courts. One L-shaped plot. July reopening. No extensions. The school calendar was not moving. Everything else had to. Dharashiv Maharashtra 18 Days to Handover 5,500 Square Feet PP Tiles 2 Sports, One L-Shaped Plot Red + Green PP Tile Colours 2 Days Before Reopening 5 Yrs PP Tile Warranty THE CHALLENGE The PE teacher had one requirement, stated clearly at the first meeting: the courts must be ready before the school reopens in July. Not substantially complete. Not "just the markings are left."... Read more...
From Cracked Concrete to Centre Court
Before: 15 Years of Neglect After: ITF-Standard Centre Court February — 7,800 sqft of concrete, 15 years old, 40% structurally compromised. The tennis club had stopped playing on it two years before this photo. The court had become overflow parking for the society. March — 8-layer acrylic system. Grass Green playing surface, Dark Green run-off perimeter, ITF standard markings. Tennis club membership went from 12 to 45 within 60 days of handover. Gurgaon Haryana 7,800 Square Feet Resurfaced 16 Days to Complete 40% Saved on Base Cost 8 Acrylic Coating... Read more...
Building Through the Rain
Late June, Tezpur — the monsoon and the tiles arrived in the same week. Assam gets up to 3,500mm of rain a year. Most of it had strong opinions about our schedule. The material truck crossed a Brahmaputra tributary by ferry — 2,500 km from Dehradun. One of those crossings meant an 11-hour wait at the waterline. Day 12 — tiles going in between showers. The crew learnt to read the sky as carefully as the tile grid. Every dry window was used fully. Tezpur Assam 3,500 Square Feet Installed... Read more...
A Backyard Court, 12,000 km from Home
He discovered pickleball in Sunnyvale, California, on a Saturday afternoon in 2019, at a community court behind a library. He had gone expecting to wait. He left three hours later, drenched and completely hooked. By the time the pandemic sent him home to his parents in Bangalore for five months in 2020, he had played on courts in three US states. He had also, quietly, pulled out a measuring tape. Bangalore Karnataka 1,800 Square Feet 14 Days to Complete 8 Acrylic Layers Applied 12,000 km — Client's Distance 12 Neighbours... Read more...
Four Courts on a Hillside
Day 0 The Problem Statement A badminton academy at 2,200 ft on the Dehradun-Mussoorie ridge. Four regulation courts planned. One access road, 8 ft wide. 200 metres the truck could not reach. The question was not whether we could deliver the tiles — it was how to get them from the road to the site. Day 3 Material Arrives at Roadhead 5,200 tiles, 616 kerbs, 16 corner pieces arrive by truck. Offloaded at the last vehicle-accessible point. Human chain of 14 workers begins carrying material 200 metres uphill in relay... Read more...
Where Lunchtime Became Game Time
Before After The parking lot in January — 5,800 sqft of cracked asphalt, 12 unused bays, and a drain that backed up every monsoon. The same space in March — 8-layer acrylic surface, dual-sport markings, and 200+ employees rediscovering their lunch break. Hyderabad Telangana 5,800 Square Feet Transformed 18 Days (Weekend-Only Build) ₹9L Total Project Cost 8 Acrylic Coating Layers 200+ Employees Per Month 31% Wellness Score Increase THE CHALLENGE "Employee wellness infrastructure." The slide had been going around in board decks for two quarters. Every large tech company in... Read more...
Two Badminton Courts That United 50 Families
"We voted 37 to 13. I was one of the 13. By the end of the first month, I was out there every evening with my daughter. I was wrong, and I am glad I was wrong." A Resident, Flat No. 402, A Residential Society, Pune Pune Maharashtra 2,600 Square Feet (2 Courts) 10 Days to Complete 2,600 PP Tiles Laid ₹4.8L Total Project Cost 34 Residents Playing Daily 94% RWA Satisfaction Score THE CHALLENGE The vote was 37 to 13. A society of 50 families in a mid-rise complex... Read more...
A School Basketball Court Built in 12 Days
Drone footage from Day 12 of the build — the morning before handover. Students were back from summer vacation 48 hours later. Ranchi Jharkhand 7,200 Square Feet 12 Days to Complete 7,200 PP Tiles Installed ₹12.5L Total Budget 140 Students Use Daily 15 Yrs Product Warranty Life THE CHALLENGE The principal's message came on a Tuesday in late May. Fourteen days. That was all the time left before 1,400 students returned from summer vacation. The school had approved the basketball court in the annual budget back in February — but... Read more...